WALSYWA » Works
Throughout our long history, the quality of the products we develop has been tested and proven in some of the most important projects in the country. Constructions with the highest standards of demand in safety and performance have found Walsywa a reliable partner.
Here are some examples:
In the construction of the Metro Line 5 emergency walkway, there was a need to fix precast concrete supports to support the concrete slabs that, …
In the construction of an apartment building, the need to carry out structural reinforcement work in the building’s basement was detected. Structural reinforcements are carried …
In a project comprising 223 residential units, including one-story houses and two-storey houses, the construction system adopted was the in-situ concrete molding, which consists of …
With 145,000 m² of construction, the development comprises a shopping mall and a 6-star hotel with 122 suites, in addition to the restoration of an …